This gridwork pattern is attained after the entire batten system is installed. Stocking the roof with the panels and laying the field is the next step in the process of installing the Metal Roof.
Viewed: 425 times.
|
Insulating the roof is optional. The siding, head wall issues, protrusions or exterior mounted satellite systems are dealt with in the battening stages of metal roofing. It is important to address these issues with the contractor before the job starts.
Viewed: 395 times.
|
The field
Viewed: 442 times.
|